CALBLOCK-PV-030: VIS CTI-induced covariance¶
Observation configuration file¶
Scheduling¶
Once, during PV phase.
In case of failure, repeat at next possible opportunity.
Time-critical¶
No
Dependencies¶
VS-CU commissioned
Objective¶
Obtain the CTI-induced covariance map.
Observations¶
Observe 20 flat field pairs at low fluences of 25, 50 and 100 ADU, each, with LED3. Bias pairs are mandatory, to correct for the Bias covariance. To neutralize AOCS wait times, and to accommodate antenna repointing, the following strategy is foreseen:
for fluence in [25, 50, 100 ADU]:
Repeat 2x:
2x BIAS, 4x FLAT, SS, dither
6x FLAT, SS, dither
Fulfilling¶
Targets and pointing constraints¶
Pointing: Straylight suppression as per MOCDA-SYS-003.
# ID |
R.A. |
Dec |
SELFCAL-FAINT |
268.51 |
65.09 |
Instrument configuration¶
Instrument: VS-CU on
Methodology / Uplink procedure¶
Entity: VIS
Commanding Method: VIS:
Dither Sequence: Random dither offsets in 3’ box
Inter-operability constraints¶
None.
In-orbit duration¶
In-orbit Duration: 7.4 h + dither (x12)
Note that 66s of the CDPU processing time has been absorbed into the dither/slew duration.
Data volume¶
(2*VB + 10*VF + 2*VS)*6 = 32424 MB (VF=400 MB)
Processing input¶
Ground Processing Input Data: BPM, nonlinearity calibration correction, ground-based QE
Data Description: Per fluence 20 flats, 4 biases, 4 short science
Processing output¶
Covariance per detector quadrant.
Quality control parameters¶
DataModel: https://gitlab.euclid-sgs.uk/
Contact person¶
VIS instrument scientist