CALBLOCK-PV-034: VIS Charge Injection Timing

Parent requirement

Observation configuration file

Scheduling

In case of failure, repeat as soon as possible. This calibration should be taken when radiation damage to the detectors is still very low.

  • CI-DELAY variant:

Execute 2 sequence blocks during PV phase; each block consisting of 4x the CIL sequence listed below.

One block to be executed at the beginning with CALBLOCK-PV-028, and one at the end of PV phase.

  • CI-DARKS-15 variant:

Run once for each particular SAA/AA spacecraft attitude of interest.

Time-critical

The observations should be performed as close in time as possible to the ROS-type (32 CIL pattern) nominal charge injection block CALBLOCK-PV-028: VIS CTI Charge Injection.

Dependencies

None

Objective

  • CI-DELAY variant:

Add additional information about trap capture and release times by varying the charge injection speed.

  • CI-DARKS-15 variant:

These observations provide verification of straylight signal reconstruction in Charge Injection images. The reconstruction will be derived from a standard Dark image with the same straylight attitude. For details, refer to the CI-DARK-AB variant Objective of CALBLOCK-PV-028: VIS CTI Charge Injection.

Observations

  • CI-DELAY variant:

THere are 6 different combinations of ID_DELAY and TOI_CHG_INJ to be executed:

Table 69: Variable charge injection data (PV). CSV file

# Number

ID_Delay [us]

TOI_CHINJ [us]

1

128

86

2

191

114

3

191

143

4

381

250

5

762

500

6

1500

1000

Constant CIL parameters for all ID_DELAY and TOI_CHG_INJ combinations:

  • EXPTIME = 1 ms

  • DAC_IDL = 10.5 V

  • ID_WIDTH = 60 us

  • CHG_INJ_ON = 260

  • CHG_INJ_OFF = 1790

  • VSTART_CHJ_INJ = 16

  • VEND_CHJ_INJ = 2066

  • VSTART = 0

  • VEND = 2086

  • \(30\mu{\rm s}\) DWELL (CHINJ_RoDly) = OFF

  • DAC_IG1 = 4.75 V

  • DAC_IG2 = 6 V

The 6 different CIL sequences are interleaved with a BIAS to constitute a timing scan. The scan is repeated 4x in a single sequence block:

Observation instructions 50: Charge Injection Timing Scan, single sequence block. This sequence block is to be executed twice during PV.
Repeat 4x:
   BIAS, CIL-1, CIL-2, CIL-3
   dither (for HGA repointing)
   BIAS, CIL-4, CIL-5, CIL-6
   dither (for HGA repointing)
  • CI-DARKS-15 variant:

The timing parameters (ID_DELAY, TOI_CHG_INJ) affect the CI-Dark outcome, and hence we have 5 different CI parameter configurations 1, 2, 3, 4 and 5.

These configuration correspond to the first 5 CI timing configurations as given above. Entry 6 in the table is the same as configurations B in the CI-DARK-AB variant of CALBLOCK-PV-028: VIS CTI Charge Injection, and will not be repeated in this CALBLOCK.

At each pointing, take a Bias, 2x Darks, and 4x charge injections (CI) frames with no charge injected (“CI-Dark”). The straylight dependence will be studied in depth in CALBLOCK-PV-028: VIS CTI Charge Injection, which require >3 straylight levels. Here we study the timing dependence, hence a minimal set of straylight levels is used.

Observation instructions 51: Timing-related Charge-Injection Dark (CI-Dark) sequence.
for each AA = [0.0, -2.5, -5.5]:
   BIAS, DARK, DARK, CIDark-1, CIDark-1, CIDark-1, CIDark-1
   dither
   BIAS, DARK, DARK, CIDark-2, CIDark-2, CIDark-2, CIDark-2
   dither
   BIAS, DARK, DARK, CIDark-3, CIDark-3, CIDark-3, CIDark-3
   dither
   BIAS, DARK, DARK, CIDark-4, CIDark-4, CIDark-4, CIDark-4
   dither
   BIAS, DARK, DARK, CIDark-5, CIDark-5, CIDark-5, CIDark-5
   dither

Fulfilling

Complements CALPRODUCT-VS-005: VIS CTI Charge Injection Lines

Targets and pointing constraints

Pointing: Straylight suppression as per MOCDA-SYS-003, and specifically \({\rm SAA} > 92\) for CI-DELAY variant.

Pointing: Straylight variability for CI-DARKS-15 variant: \({\rm AA} = [-5.5, -2.5, 0.0]\).

No specific target required.

Instrument configuration

Instrument: Wide survey

Inter-operability constraints

None

In-orbit duration

In-orbit Duration: 16.1 h + dither (x31)

CI-DELAY Variant: 2.5 h + dither (x8) [single block duration]

A block must be repeated once later in the PV phase, for a total of two blocks.

CI-DARKS-15 Variant: 2659s x 5 x 3 = 11.1 h + dither (x15)

Note that 66s of CDPU processing time has been absorbed into each dither/slew.

Data volume

Total = 28310 MB

(2*4+15)*VB  = 5750 MB for the Bias
6*VC(330MB) * 4 = 7920 MB for the CI
15*VC(330MB)  = 4950 MB for the CI-Dark
30*VD = 9690 MB for the Darks

Processing input

Ground Processing Input Data:

Data Description: 8 BIAS (LE1) and 24 CIL (LE1) [CI-DELAY variant]

15 BIAS, 30 DARKs, 60 CI-Darks (LE1)

Processing method

Binning, Cosmic Ray Flagging, CTI correction tools in VIS_CTI PE.

Processing output

Master Charge Injection Non-uniformity Pattern.

Statistics on Charge Injection temporal consistency.

Initial CTI model.

Required accuracy, constraints

Processing tools

VIS_CTI IOT analysis

Quality control parameters

DataModel: https://gitlab.euclid-sgs.uk/

Contact person

VIS instrument scientist