CALBLOCK-F-016: VIS Charge Injection Timing

Observation configuration file

ocf_CALBLOCK-F-016_CI-DELAY.csv

Scheduling

Every 5-7 months.

In case of failure, skip and continue with the plan.

Objective

To gain statistics on Charge Injection temporal consistency, and add additional information about trap capture and release times by varying the charge injection speed.

Observations

Execute a single block sequence of the CI-DELAY variant as described in CALBLOCK-PV-034: VIS Charge Injection Timing.

Fulfilling

Targets and pointing constraints

Pointing: Straylight suppression for CI-DELAY variant: \({\rm SAA} > 92\) and \({\rm AA}<=-3.5\).

No specific target required.

Instrument configuration

Instrument: Wide survey

Inter-operability constraints

None

In-orbit duration

In-orbit Duration: 2.5 hours + 8 dithers

Data volume

Total = 9920 MB

Processing input

Ground Processing Input Data: Prerequisites for CIL images

Data Description: CIL images

Processing output

Master Charge Injection Non-uniformity Pattern. Statistics on Charge Injection temporal consistency. Additional information about trap capture and release times by varying the charge injection speed.

Required accuracy, constraints

Images successfully acquired

Processing tools

Non-SGS tools, one-time calibration.

Quality control parameters

DataModel: https://gitlab.euclid-sgs.uk/

Contact person

VIS Instrument Scientist