CALPRODUCT-VS-001: VIS Absolute Photometric Standards¶
Parent requirement¶
Scheduling¶
Once, during PV phase, with high spatial sampling.
Upon request during routine phase, with low spatial sampling, if unexplained discrepancies occur in photometry after processing.
Objective¶
Obtain absolute flux standard measurements as a function of position for each VIS detector, therefore characterizing the entire optical path. The observations serve as an independent check of the global system response, as well as the impact of persistence and trap filling.
Observations¶
Fulfilled by¶
CALBLOCK-PV-002: NISP-P and VIS Absolute Photometric Standards (PV phase)
CALBLOCK-PV-001: Self Calibration
CALBLOCK-F-001: Self Calibration
CALBLOCK-F-006: Wide Survey (spot check, using flux-calibrators in the survey area)
Targets and pointing constraints¶
# ID |
R.A. |
Dec |
Type |
r [AB mag] |
J [AB mag] |
H [AB mag] |
comment |
WDJ175318+644502 |
17:53:18.65 |
+64:45:02.15 |
DA |
17.45 |
18.26 |
18.36 |
<1% variability; in Self-cal |
WDJ174911+643533 |
17:49:11.78 |
+64:35:33.54 |
DA |
17.01 |
17.86 |
18.26 |
1% variability |
WDJ181144+654916 |
18:11:44.96 |
+65:49:16.42 |
DA |
17.76 |
18.62 |
19.14 |
2-3% variability |
WDJ040027-502542 |
04:00:27.30 |
-50:25:42.04 |
DA |
18.28 |
19.38 |
20.00 |
1-2% variability |
WDJ041345-473726 |
04:13:45.06 |
-47:37:26.29 |
DA |
17.00 |
17.71 |
18.27 |
<1% variability |
WDJ042211-474142 |
04:22:11.36 |
-47:41:42.02 |
DB |
15.77 |
16.66 |
17.17 |
5-7% variability |
J175300+663151 |
17:53:00.90 |
66:31:51.30 |
Ell |
19.30 |
for validation purposes only |
Data volume¶
NISP: 3*16*16*3 * NP = 202752 MB
VIS: 256*VS = 115712 MB (TBC)
Processing input¶
Ground Processing Input Data:
Data Description:
NISP:
3*16*16*3 = 2304photo-MACC imagesVIS: 256 images (one VIS image at every dither point)
Processing output¶
Mean and stdev of the photometric zeropoint (conversion factor) per detector
Plot of zeropoint as a function of position in the focal plane (with the detector grid overlaid)
Required accuracy, constraints¶
Photometric flux measurement / photometric conversion factor derived from each position are within 1.0% of the mean.
Comparison with expectations from the total system throughput, should be within 5%, but may be larger.
Processing tools¶
L1 science pipeline and absolute calibration pipeline, additional offline trend analysis of flux measurements
Validation¶
The map of absolute zeropoints should mainly reflect the quantum efficiencies at the respective pixel coordinates. Other effects, such as optical bandpass variations, are negligible (for NISP, but probably not for VIS due to the effective dichroic bandpass for VIS).
The data can be used to directly test the top-level CalCD-A requirements R-CAL-A-VS-4000 (After all calibrations, the relative photometric error of the VIS Instrument shall be < 1.0%), and G-CAL-A-VS-5000 (After all calibrations, the absolute photometric error of the VIS Instrument shall be < 5.0%). After all calibrations, the distribution of measured fluxes at the various detector positions, normalized by the intrinsic (true) fluxes, must have a width of not more than 1.0% of the flux (after correcting for photon noise), and the absolute fluxing should meet the CalCD-A goal.
Recovery¶
A failure of the validation is critical for the mission success. It must be investigated with high priority. Possible causes are (non-exhaustive)
a severe short-coming in the data processing
incomplete understanding of the error budget
a significant change in hardware properties occurred (electronic, contamination, …)
Quality control parameters¶
DataModel: https://gitlab.euclid-sgs.uk/
Contact person¶
VIS instrument scientist